КОС-ЗOO

 

 

Facility: the production and assembly of the equipment to the facility "КОС-ЗOO" "Construction of sewage treatment facilities with capacity of 300,000 m3 per day" in Turkmenistan, Ashkhabad.

 

Equipment: FAAS Trading Co has implemented a comprehensive supply of equipment including:

 

• 10 kV distribution point - 29 cells;

 

• reactive power compensation-10kV-900kVAr - 2 pcs.;

 

• soft start system of six blowers equipped with asynchronous motors AM1 450L2A BSS of 1000 kW capacity, based on two devices;

 

• 10 kV gas-insulated monoblocks – 13 pcs.;

 

• 0.4 kV switchgears - 15 sections;

 

• three-phase dry power transformers with the capacity of 160kVA up to 2500kVA with the voltage of 10/0,4 kV with the Trihal cast isolation in a metal sheath (IP31) windings connection group "triangle-star-11" with the neutral available with the forced ventilation - 15 pcs.;

 

• busbar system from 1600A to 4000A - 7 pcs.

 

 

 

Some information about the facility:

 

The total area of the building site is 75 ha. Purification workflow is provided by the following buildings and structures placed on the site:

 

• main sewage pumping station

 

• receiving chamber

 

• building of lattices (2 pieces) 

 

• sand traps (8 pipelines)

 

• activated sludge unit (16 pieces)

 

• secondary settling tanks (16 pieces)

 

• pump station of the secondary settling tanks discharging (4 pieces)

 

• sludge pump station (2 pieces)

 

• blowing house (1 building)

 

• sludge thickeners (3 pieces)

 

• aerobic stabilizers (4 piece)

 

• effluents decontamination unit (1 pieces)

 

• sludge drying beds (16 pieces)

 

• sand bunkers building (2 pieces)

 

• water supply unit (1 pc).

 

Besides these technological facilities the administration block, garage for 10 cars, wheels wash and car repairs trestle are located on-site.